Thanks be to God, on April 24, 2013, the surveyors arrived with their equipment and set the four corners of the building while the masons offloaded their backhoe, squared off the first third of the proposed building, and started digging out the space for the footers. Below are four architectural drawings and pictures of the progress from the beginning to the present.
Also, if you go to http://www.facebook.com/mastconstructionco88, you will find other pictures posted by our contractor, Dale Mast. You do not have to have a Facebook account to do this.
West side fire wall is waiting
till we have the funds to add
the second third ($500,000 to
build shell). The three double
door openings on the left lead
to the chapel. The single
door with steps goes into the
sacristy/work area. The
double door opening on the
second floor will connect the
hallways between the 1st and
2nd thirds. The single door
under the roof goes to the
mechanical room for this
third. The bump out is the sunroom.